Projects
Multi purpose port in Cienaga, Colombia
Equipment requested.
- 7.000 TPH Conveyor system with ship loader, with 2 KM land 4 KM ocean conveyor to be mounted in barges.
- 9.000 TPH conveyor system with ship loader with 2 KM land 4 KM ocean conveyor.
- Encapsulated system for coal deposit patios, for pollution control.
Río Magdalena Project, Colombia
Equipment requested
- Self propel Barges for 1.800 T capacity
- Tugs, barges for Coal.
- Dredges For sea and fresh water.
|